There will be roadworks in the village starting on 7 April and lasting until 20 April 2016. The section of road is from outside St Joseph’s Church to Opposite Church Cottage on Lower End. Traffic will be controlled by stop/go boards.
The work is to be carried out by BT and is in respect of the installation of a new cabinet in the village as a part of the upgrade to the broadband service.